Date:
Friday, February 2, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Stephanie Hamilton
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Maria Pereira
Problems:
Near the end of the night (9:04 UTC) the "DECAL" component wasn't prepared for the next exposure, stopping the queue.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Proposal:
2018A-0251
Target of Oportunity:
No
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Plane Survey
Primary Investigator:
Finkbeiner
Email:
Institution:
Harvard
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2018-02-02 | 8.25 | 0.0 | 0.0 | 0.0 | 0.0 | 8.25 |
DES night summary: http://des-ops.fnal.gov:8080/nightsum/nightsum-2018-02-02/nightsum.html