Date:
Friday, September 1, 2017
Telescope:
CTIO Blanco 4-m
Submitter:
William Wester
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Jessie Muir
Problems:
None.
Program:
Proposal:
2017B-0110
Target of Oportunity:
yes
Time Observed:
0.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Berger
Email:
Institution:
Harvard
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
0.5
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
10.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-09-01 | 22 | 0.0 | 0.0 | 0.0 | 0.0 | 22 |
ToO observed at start of night
DES running throughout the rest of the night. Night Summary: http://des-ops.fnal.gov:8080/nightsum/nightsum-2017-09-01/nightsum.html