Date:
Tuesday, January 17, 2017
Telescope:
CTIO Blanco 4-m
Submitter:
Gregory Green
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
A. Plazas, D. Gruen, Greg Green, Tansu Daylan (observers)
Problems:
None.
Program:
Proposal:
DES
Target of Oportunity:
yes
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
J. Frieman
Email:
Instrument:
CTIO 4m DECam
Total Program Time:
4.25
Proposal:
2016B-0279
Target of Oportunity:
No
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Plane Survey
Primary Investigator:
Douglas Finkbeiner
Email:
Institution:
Harvard
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-01-17 | 8.5 | 0.0 | 0.0 | 0.0 | 0.0 | 8.5 |
None.