Date:
Monday, January 2, 2017
Telescope:
CTIO Blanco 4-m
Submitter:
Roberto Munoz
Submitter Email:
Observer Support:
Alfredo Zenteno
Night Assistant:
Alberto Alvarez
Problems:
- Power outage between 10:02PM and 10:12PM local time.
- DTS node DTS-CT went offline (Alert immediately after resuming observations after power outage); Mike Fitzpatrick was informed at 10:23PM local time and restarted the node immediately.
- At UT 6:35 while slewing and starting the observations of SDSSJ0843-0000, there was a problem with the shutter. There was an alarm, the nigh assistant had to solve the problem and we restarted the observations after 1 min ocurred the issue.
Comments:
- BTW, what does "Fsee" mean in the DIMM2 Environment page and how does it relate to the seeing?; there did not seem to be much in the way of documentation for the end-user.
- DES night report (first-half program): http://des-ops.fnal.gov:8080/nightsum/nightsum-2017-01-02/nightsum.html
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Proposal:
2016B-0910
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Night watch
Primary Investigator:
Thomas Puzia
Email:
Institution:
Pontificia Universidad Catolica de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-01-02 | 7.75 | 0.0 | 0.25 | 0.0 | 0.0 | 8 |