Date:
Tuesday, November 15, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Kathy Vivas
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
Alfredo Zenteno
Problems:
1) During afternoon calibrations, IB were not building the images properly and some CCD extensions were missing. A SISPI restart solved the problem and calibrations were manually restarted where it was left
2) At the begining of the night (moving to the second standard field) the telescope brakes got activated. Problem was solved after re-balancing th etelescope. Total time lost = 1 hour
3) Louver windows closed at 8:40pm due to alarm of high humidity.
Also, during afternoon calibrations there was a "DECAL not ready" alarm. Solved by reseting the DECAL computer
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
6.75
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-11-15 | 6.75 | 0.0 | 1.0 | 0.0 | 0.0 | 7.75 |
The seeing was excellent tonight. Most of the night was well below 0.9". We obtained a Y image with 0.66" (according to QuickReduce)