Date:
Sunday, July 17, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Carlos Corco
Problems:
Engineering Night, testing interface between DECam AOS and Blanco 4MAP for tweaking the mirror figure. Did not work, and software changes in the AOS killed the tweaks for the hexapod. Kevn Reil logged in an patched out his changed code. DES OBsTac test failed due to issue with it being July. Calle Eric Nielson at 3:30 am amd he hacked the code and the configuration file. It then worked Cloudy for about 1/3 of the night, never photometric so could not do star flats or CalSpec star. Spent time on verifying the new pointing model.
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
11.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
11
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-07-17 | 0.0 | 11.0 | 0.0 | 0.0 | 0.0 | 11 |
None.