Date:
Thursday, March 31, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Lori Allen
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
David James and tomorrow night's observer.
Problems:
1) Lost 40 minutes at beginning of night to RA drive failure. A severed cable was found and repaired.
2) Lost 30 minutes to dome encoder failure.
3) DIMM2 out of service all night.
Program:
Proposal:
2013B-0536
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam NEO
Primary Investigator:
L. Allen
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-03-31 | 10.5 | 0.0 | 1.25 | 0.0 | 0.0 | 11.75 |
See "Problems" block for description of problems.