You are here

ENR CTIO Blanco 4-m 2015-11-20

Primary tabs

Date: 
Friday, November 20, 2015
Telescope: 
CTIO Blanco 4-m
Submitter: 
Jelena Aleksic
Submitter Email: 
Observer Support: 
Manuel Hernandez
Night Assistant: 
Alberto Alvarez
Problems: 

DECal computer crashed (see the SISPI log for detailed list of alerts). Operations resumed after the machine reboot

Last moment addition: the last standard has failed (error: missing CCD extensions). Attempt to finish the standards failed. 

SISPI got stuck configuring, and was reinitizalized. We took the zeros at 06:05 local time. 

Comments: 

 Poor and unstable seeing conditions during approx. one hour of the final quarter (with seeing values ranging from 1.4 to 1.8). DIMM seeing was more stable and closer to 1 during that time (maximum being 1.3).

 

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
0.90
Seeing Variability: 
0
Seeing Source: 
The Telescope I used
Sky : 
1
2nd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
0.90
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
1
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.90
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
1
4th Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.40
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky: 
2
Program: 
Proposal: 
2012B-0001
Target of Oportunity: 
No
Time Observed: 
8.0
Time Engineering: 
0.25
Time lost technical: 
0.25
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DES
Primary Investigator: 
Josh Frieman
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Total Program Time: 
8.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2015-11-20 8.0 0.25 0.25 0.0 0.0 8.5