Date:
Thursday, October 29, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Nikolay Kuropatkin
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Chris Smith, Daniel Goldstain, Humberto Orrego
Problems:
Hardware failer in water cooling of electronics.(NESLAB1 ). Cooling reastablished with NESLAB2, but SISPI restart failed on BKP5. Observing canceled for the rest of the night.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
5.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-10-29 | 5.25 | 0.0 | 0.0 | 0.0 | 0.0 | 5.25 |
None.