Date:
Wednesday, October 28, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
None.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
6.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
2.5
Time lost other:
0.0
Description:
DECam Legacy Survey
Primary Investigator:
David Schlegel
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-10-28 | 6.25 | 0.0 | 0.0 | 2.5 | 0.0 | 8.75 |
Clous forming in the second half, eventually had to stop, Bright Moon.