Date:
Wednesday, July 8, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Rich, Clarkson, Howard
Submitter Email:
Observer Support:
Kathy Vivas
Night Assistant:
Alberto Alvarez
Problems:
Multiple main-GUI crashes on the Observer Console; occasional guiding problems (likely weather related; particularly in u)
Main problem: internet connectivity made assessment of weather challenging (we understand however this may be a problem outside the scope of Tololo).
Variable to thick cloud cover.
Program:
Proposal:
2015A-0322
Target of Oportunity:
No
Time Observed:
6.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
5.0
Time lost other:
0.0
Description:
Blanco DECam bulge Survey
Primary Investigator:
Rich
Email:
Institution:
UCLA
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-07-08 | 6.0 | 0.0 | 0.0 | 5.0 | 0.0 | 11 |
No instrumental problems noticed.