Date:
Wednesday, June 24, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Chris Smith
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Leonardo Paredes
Problems:
8 ccds (one backplane) stopped working around 10pm. Marco worked on diagnosing the problem, but couldn't fix. Closed around midnight.
Program:
Proposal:
2015A-0397
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
0.0
Time lost technical:
9.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Light Echos
Primary Investigator:
Armin Rest
Email:
Institution:
STSCI
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-06-24 | 2.0 | 0.0 | 9.5 | 0.0 | 0.0 | 11.5 |
None.