Date:
Friday, January 9, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
David James
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Rodrigo Hernandez
Also Present:
Dustin Lang, Jeff Cummings, Rogerio Rosenfeld, Niall MacCrann
Problems:
Problem with guider at 01:00 UTC. Noticed no guider data being displayed by GUI or telemetry. |
||||
(30-minutes lost due to guider check-out).
Shutter error at 01:54 ... normal error processing commands followed - 4-minutes lost.
03:23 local: 4MAP failures (Faculty MAMAC 1): Usual recovery mode at zenith performed.
6-minutes lost
Nice work by Hernan T. and Rodi H. to fix the problems quickly. DJJ
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.25
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
The Dark Energy Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS: DECam Legacy Survey
Primary Investigator:
David Schlegel and Arjun Dey
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-01-09 | 6.75 | 0.0 | 0.75 | 0.0 | 0.0 | 7.5 |
None.