Date:
Thursday, December 4, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
David Rojas, Leonardo
Problems:
One shutter error. One minute to recover using the standard procedure.
Compressor flow-meter noisy. JIRA written.
Program:
Proposal:
Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam checkout, testing hexapod LUT, primary mirror LUT
Primary Investigator:
ALISTAIR WALKER
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
8
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-12-04 | 0.0 | 8.0 | 0.0 | 0.0 | 0.0 | 8 |
Nice night.