Date:
Monday, November 10, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Ting Li, Chris D'Andrea
Problems:
One reset needed when SISPI-TCS comm failed at the start of the night. 1 minute lost
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
ENGINEERING
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
8.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-11-10 | 0.0 | 8.75 | 0.0 | 0.0 | 0.0 | 8.75 |