Date:
Saturday, October 11, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Leonardo
Problems:
RASICAM limping along
Fixed LN2 leak during the day with a few hammer taps on a stuck relief valve
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
10.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
ENGINEERING
Primary Investigator:
ALISTAIR WALKER
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
10
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-10-11 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10 |
Good data for hexapod reference and 4MAP calibration. Cloud made the last few hours pretty useless