Date:
Monday, July 14, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Chris Smith
Submitter Email:
Observer Support:
Claudio Aguilera
Night Assistant:
Manuel Hernandez
Also Present:
Yura Monsanto
Problems:
SISPI interlock broke at 5:45am; tried various resets (OCS role, then general reset, then configure...) none worked. Tried restarting SISPI. It came back, but about 30s after configuring the interlock broke again, this time with a mention of DECal. Called David James at 0.9m (fortunately). He reset DECal. We tried just running Configure but that didn't work, so we restarted SISPI again and that worked.
Note: in the TigerVNC window, we noticed that the six PANVIEW windows are coming up all stacked on top of one another, not spread out as they usually are. Significant????
Program:
Proposal:
2014A-0390
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
A Pilot DECam Time-Domain Survey
Primary Investigator:
J. Bloom
Email:
Institution:
University of California, Berkeley
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-07-14 | 10.5 | 0.0 | 0.5 | 0.0 | 0.0 | 11 |
None.