You are here

ENR CTIO Blanco 4-m 2014-06-08

Primary tabs

Date: 
Sunday, June 8, 2014
Telescope: 
CTIO Blanco 4-m
Submitter: 
Tim Abbott
Submitter Email: 
Observer Support: 
Manuel Hernandez
Night Assistant: 
Alberto Alvarez
Also Present: 
David Rojas
Problems: 

At around 10pm (image #321554), the images went bad all over.  They were, in fact, completely saturated, although this was not immediately obvious from Kentools because it was displaying them at an apparent illumination level of 1000ADU.  The over-illumination was present in the r (saturating in 5s) and VR filters only.  After a fair amount of faffing about we discovered that one of the upward facing BCAMs was stuck on.  We tried running without the BCAM controller, but SISPI would not cooperate.  We turned the controller back on and I continued to collect data in the hope that the problem will not recur.  Time lost: 3+ hours.  See JIRA entry http://jira.ctio.noao.edu:8080/browse/BLANCO-142.
 

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
1.50
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
1.70
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
1.60
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.50
Seeing Source: 
The Telescope I used
Sky: 
0
Program: 
Proposal: 
2012A-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.25
Time lost technical: 
3.25
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Blanco engineering
Primary Investigator: 
Tim Abbott
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
11.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2014-06-08 0.0 8.25 3.25 0.0 0.0 11.5