Date:
Thursday, May 29, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
David Nidever
Submitter Email:
Observer Support:
Humberto Orrego
Night Assistant:
Claudio Aguilera
Also Present:
Kathy Vivas
Problems:
None.
Program:
Proposal:
2013B-0440
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
3.25
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
David Nidever
Email:
Institution:
U. Michigan
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-05-29 | 8.0 | 0.0 | 0.0 | 3.25 | 0.0 | 11.25 |
Dome closed until 10:30pm because of high humidity.