Date:
Sunday, April 27, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
David James
Submitter Email:
Observer Support:
David James
Night Assistant:
Alberto Alvarez
Also Present:
Lori Allen, David Trilling, Manuel Hernandez
Problems:
None really. One minor SIPSI interlock error -- timeout to GSC -- restarted role, and reconfigured, all good
Program:
Proposal:
2013B-0536
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam NEO Survey
Primary Investigator:
Lori Allen
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-04-27 | 10.5 | 0.0 | 0.0 | 0.0 | 0.0 | 10.5 |
Beautifully clear night, seeing a little variable