Date:
Monday, March 17, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
David Rodriguez
Submitter Email:
Observer Support:
Alberto Alvarez
Night Assistant:
None
Also Present:
Alfredo Zenteno
Problems:
At about 4:30am, local time, the dome stopped moving. This was fixed shortly, but then the various computers had trouble communicating with each other. Eventually, this was all solved. Time lost: 1.5 hours.
Other than that, the night went smoothly.
Program:
Proposal:
2014A-0613
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
David Rodriguez
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
9.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-03-17 | 8.0 | 0.0 | 1.5 | 0.0 | 0.0 | 9.5 |
None.