Date:
Friday, January 24, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Ricardo Munoz
Submitter Email:
Observer Support:
Humberto Orrego
Night Assistant:
Claudio Aguilera
Also Present:
David Gerdes, Tomasz Kacprzak (first half), Ricardo Munoz (second half)
Problems:
During the second half of the night, after exposure 277676 the Interlock turned red and everything stopped. We tried reconfiguring and the Interlock turned green again. When the observations were resumed., everything seemed OK, bu the new images were not built nor delivered.
We tried shutting down SISPI and re-starting it, but the system didn't seem to start properly and nothing else happened.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2013B-0614
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
0.0
Time lost technical:
1.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
Munoz
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-01-24 | 5.75 | 0.0 | 1.75 | 0.0 | 0.0 | 7.5 |
DES (first half):