Date:
Thursday, January 23, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Ricardo Munoz
Submitter Email:
Observer Support:
Humberto Orrego
Night Assistant:
Claudio Aguilera
Also Present:
Claudio Bruderer, David Gerdes, Tomasz Kacprzak (first half)
Problems:
None.
Comments:
*Observing Team*
_DES Observers:_ David Gerdes, Claudio Bruderer, Tomek Kacprzak
_Telops:_ Claudio Aguilera
_Remote Support:_ Humberto Orrego
*Observing Plan*
# standard bias and dome flat sequence
# evening standard stars
# run ObsTac queue
# Standards carried out in banded cirrus
# handover to 2nd half
*Conditions*
# weather in afternoon: 4pm (local): scattered high clouds
# weather after dinner: 7pm (local): Heavy cirrus
# weather at 10 deg twilight: 21:30 (local): Cirrus in SW, low wind. Conditions non-photometric at start of evening.
# weather summary: 2am (local):full cloud cover
# Seeing conditions: Median:1.2 RMS: 0.2
# Wind conditions: Low the whole half-night
*Accomplishments*
# Afternoon: zeros done 276851-276859 and 276935-276943, (ugrizY) dome flats done 276860-276934, checked all ok, u dropping as usual
# Winner of post sunset leisure activity: The crew from the 0.9m who enjoyed the sunset from our catwalk.
# Evening: Standards 276947-276961
# Survey Exposures 276964-277383
# Middle of night (end of half night): Standards 277384-277388
*Problems tagged as Synopsis_Problem*
None.
*Minor Problems and Relevant Information*
# Occlusion alarms: about half a dozen alarms during the night.
*Notes for Data Management*
Cloudy/non-photometric conditions at start of night, until around 277300.
More clouds near end of shift, around 277364.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2013B-0614
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
Munoz
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-01-23 | 7.5 | 0.0 | 0.0 | 0.0 | 0.0 | 7.5 |