Date:
Wednesday, January 22, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Ricardo Munoz
Submitter Email:
Observer Support:
Humberto Orrego
Night Assistant:
Alberto Alvarez
Problems:
None.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2013B-0614
Target of Oportunity:
No
Time Observed:
3.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.5
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
Munoz
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-01-22 | 7.0 | 0.0 | 0.0 | 0.5 | 0.0 | 7.5 |
First half of the night DES, second half Chilean time.
********** Comments DES **********
********** End DES comments **********