Date:
Monday, December 16, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
Kathy Vivas
Problems:
None.
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering Tests
Primary Investigator:
Alisair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
8
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-12-16 | 0.0 | 8.0 | 0.0 | 0.0 | 0.0 | 8 |
New dome encoder seems to work well.