Date:
Thursday, December 12, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alex Kim
Submitter Email:
Observer Support:
Mauricio Rojas
Night Assistant:
Claudio Aguilera
Also Present:
LO, CC
Problems:
Shutter – We had a shutter error, in which interlocks were broken and data taking stopped.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
DES
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-12-12 | 7.0 | 0.0 | 0.25 | 0.0 | 0.0 | 7.25 |
None.