Date:
Sunday, October 27, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Brian Nord
Submitter Email:
Observer Support:
David Rojas
Night Assistant:
Leonardo Paredes
Also Present:
Brian Nord, Erin Sheldon, Peter Melchior
Problems:
None.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-10-27 | 8.5 | 0.0 | 0.25 | 0.0 | 0.0 | 8.75 |
None.