Date:
Saturday, October 5, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Casey Papovich
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Problems:
The telescope power failed during the middle of the night. The operator phoned Javier (don't know last name), who came up from the dome and reset the power. Things behaved normally (as far as we can tell) after that. We lost about 45 minutes to the outage.
The Night report form was allowing me to save or submit. This is my 3rd attempt - I hope it goes through.
Program:
Proposal:
2013B-0438
Target of Oportunity:
yes
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam u-band Observations of the SHELA/HETDEX field
Primary Investigator:
Casey Papovich
Email:
Institution:
Texas A&M
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
9.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-10-05 | 8.5 | 0.0 | 0.75 | 0.0 | 0.0 | 9.25 |
None.