Date:
Saturday, September 14, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Maayane Soumagnac
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Leonardo Paredes
Problems:
I wrongly added todays date for the report of the 14th.
Today's flats checks show measured ADU/sec higher than the nominal value in the z and Y bands. This was already the case yesterday and it seems worse today.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-09-14 | 10.0 | 0.0 | 0.0 | 0.0 | 0.0 | 10 |
# At 8.37 we asked the operator to close the louvers