Date:
Saturday, July 20, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Christopher Klein
Submitter Email:
Observer Support:
David James
Night Assistant:
Leonardo Paredes
Problems:
Humidity was high for most of the night. When it dropped around 5:40 am we tried to observe, but the active optics system did not come online properly. David James: Actuator 21 of the 4MAP system has been repeatedly failing.
Program:
Proposal:
2013A-0400
Target of Oportunity:
No
Time Observed:
1.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
9.5
Time lost other:
0.0
Description:
A Pilot DECam Time-Domain Survey
Primary Investigator:
Josh Bloom
Email:
Institution:
U.Berkeley
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-07-20 | 1.75 | 0.0 | 0.0 | 9.5 | 0.0 | 11.25 |
DEC Cal scans were taken.