ENR CTIO Blanco 4-m 2013-06-20

Primary tabs

Date: 
Thursday, June 20, 2013
Telescope: 
CTIO Blanco 4-m
Submitter: 
Alistair Walker
Submitter Email: 
Observer Support: 
Mauricio Rojas
Night Assistant: 
Alberto Alvarez
Also Present: 
David Rojas
Problems: 

DECal LEDs would not work evidently after work at the top ring during the day.   Role removed from SISPI to allow images to be taken,   Please fix on Friday.   No flat fields taken for 2012B-9999.

Had trouble wirh Hexapod interlock breaking at the start of the night.   Apparently trim/tweak values causing displacements/tilts outside the accepted parameter range.  After clearing, all OK. 

Comments: 

Program (i) primary miurror 4MAP tests (ii) u band star flats (iii) Regression suite

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0
Seeing Source: 
The Telescope I used
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
1.00
Seeing Variability: 
0
Seeing Source: 
The Telescope I used
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
0.90
Seeing Variability: 
0
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
0.90
Seeing Variability: 
0
Seeing Source: 
The Telescope I used
Sky: 
0
Program: 
Proposal: 
2012B-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
10.5
Time lost technical: 
1.5
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam & telescope engineering
Primary Investigator: 
A. Walker
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
12
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2013-06-20 0.0 10.5 1.5 0.0 0.0 12