Date:
Tuesday, February 5, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alberto Alvarez
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
DES crew, Anja von der Linden, Douglas Applegate
Problems:
None.
Program:
Proposal:
2012B-0003
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
des sv
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
4
Proposal:
2013A-0360
Target of Oportunity:
No
Time Observed:
2.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
2.0
Time lost other:
0.0
Primary Investigator:
von der Linden
Email:
Institution:
KIPAC
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-02-05 | 5.75 | 0.0 | 0.5 | 2.0 | 0.0 | 8.25 |
In the utilities room the flux thing ( la bolita ) for crates was increased up to 200 units.To lower the humidity on the crates.
A las 06:15 ut aprox cerramos por alta humedad. Abrimos nuevamente a las 08:20 ut con 75% de humedad.
-----------
Closed due to humidity from 3:15 - 5:15.
Anja appreciates the safety question on the "clear exposure queue" button!