Date:
Monday, February 4, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alberto Alvarez
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Humberto Orrego, DES crowd, AvdL, DA
Problems:
Oily RA tachometer would delay our startup in about half an hour.
Program:
Proposal:
2013A-0360
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
4.0
Time lost other:
0.0
Primary Investigator:
von der Linden
Email:
Institution:
KIPAC
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.5
Proposal:
2012B-0003
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES-SV
Primary Investigator:
Freiman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
0.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-02-04 | 0.0 | 0.5 | 0.5 | 4.0 | 0.0 | 5 |
None.
---- 2nd half:
- Lost due to humidity.