Date:
Saturday, January 26, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Tim Abbott
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Problems:
None.
Program:
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-01-26 | 0.0 | 7.5 | 0.0 | 0.0 | 0.0 | 7.5 |
First half of the night used to test the new damper motor controller. This appeared to function correctly, but the filter needs tuning, which is planned for tomorrow.
Second half of night was used to collect a pointing map data set with the hexapod NOT correcting for displacement nor tip/tilt.