Date:
Wednesday, January 16, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
bob nichol
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
dave wittman, david gerdes, lyndsay Old, Kai Hoffmann
Problems:
First half: No telescope problems
Second half: lost 45 minutes at handoff due to flawed logout/in procedure.
Program:
Proposal:
2012B-0448
Target of Oportunity:
No
Time Observed:
3.0
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DLS u
Primary Investigator:
Thorman (Wittman observing)
Email:
Institution:
UC Davis
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-01-16 | 6.25 | 0.0 | 0.75 | 0.25 | 0.0 | 7.25 |
Clouds covering approximately half the sky were a problem most of the night, causing problems with centering of DECam fields and affectig depth. Lost some time trying to avoid the clouds