Date:
Sunday, January 13, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
B Nichol
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
andrea kunder, Kai Hoffman, Lyndsay Old, David Gerdes, Pele, David Wittman
Problems:
At beginning of night lost telescope control and javier had to clean tacometer. maybe do this during the day?
4map failed twice, lost about 15mins in total.
No issues with DECam
Program:
Proposal:
2012B-0448
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Email:
Institution:
UC Davis
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-01-13 | 7.0 | 0.25 | 0.5 | 0.0 | 0.0 | 7.75 |
Seeing consistently above 1.3 arcseconds in all filters - typically 1.5 to 1.6
Clear, dark (moon illumination 0.06).