Date:
Thursday, December 27, 2012
Telescope:
CTIO Blanco 4-m
Submitter:
A Walker
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Javier, Omar (phone), Rolo (phone)
Problems:
None.
Program:
Proposal:
ENGINEERING
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
9.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam tests, telescope tests
Primary Investigator:
A Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
9
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2012-12-27 | 0.0 | 9.0 | 0.0 | 0.0 | 0.0 | 9 |
. This was an engineering night. During the day Esteban & Javier with remote help from Marco
1. First 2 hours spent debugging and fixing a 4MAP to TCS communication problem
2. In a period of very stable seeing did 30s guided images in all filters in various parts of the sky. Excellent results, NO big differences between g and r filters and the rest, as reported by DES.
3. Then spent much of the rest of the night doing a baseline tracking/guiding performance pior to the damping motor control stsrem upgrade. Grid of 300s guided g band exposures all over the sky. 164151-164181.