Date:
Sunday, December 2, 2012
Telescope:
CTIO Blanco 4-m
Submitter:
Liz Buckley-Geer via Andrea Kunder
Observer Support:
None
Night Assistant:
None
Also Present:
Jim Annis
Problems:
None.
Program:
Proposal:
2012B-0003
Target of Oportunity:
No
Time Observed:
7.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES SV
Primary Investigator:
Josh Freeman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2012-12-02 | 7.0 | 0.0 | 0.0 | 0.0 | 0.0 | 7 |
Last week: the telescope team did work on the pointing model and on
resurrecting the horseshoe mount damping motor. The telescope behavior
is much improved. One of the tasks tonight was to understand how much better.
If one „zeros the offsets‰ on the first SN field,the resulting pointing rms
is: ra,dec= 11.2, 15.8
The seeing was great all night, North or South. This means the tracking is
much improved. Avoid, if possible, observing within 15 minutes of the meridian,
which features slightly worse seeing but significantly worse ellipticity.