You are here

ENR CTIO Blanco 4-m 2012-11-16

Primary tabs

Date: 
Friday, November 16, 2012
Telescope: 
CTIO Blanco 4-m
Submitter: 
David Herrera
Observer Support: 
Hernan Tirado
Night Assistant: 
Claudio Aguilera
Also Present: 
Dara Norman, Abi Saha, Katie Kaleida
Problems: 
DES team got stuck from around 23:45 through 2:00 am for problems with the SISPI. There was no connection with anything. At last minute, Ann was suggested to kill some zombie processes that she mentioned were hanging on observer1. We re-started SISPI and everything started working just fine.
Conditions: 
Program: 
Target of Oportunity: 
No
Time Observed: 
3.75
Time Engineering: 
0.0
Time lost technical: 
0.5
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam SV
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4.25
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2012-11-16 3.75 0.0 0.5 0.0 0.0 4.25