Date:
Saturday, May 20, 2023
Telescope:
CTIO 1.5-m
Submitter:
Jacqueline Seron
Submitter Email:
Observer Support:
None
Night Assistant:
Jackie Seron
Problems:
Guider restarted at the beginning of the night.
Air Conditioning in the computer room failed in the middle of the night, rebooted and ok afterwards.
Program:
Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
1.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-05-20 | 9.0 | 0.0 | 0.0 | 1.0 | 0.0 | 10 |
Program almost completed. 2 targets not observed (A212954 and RKS2004-1601.) because of overcast at the end of the night.