Date:
Thursday, February 2, 2023
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hinojosa
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hinojosa
Problems:
None.
Program:
Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-02-02 | 9.0 | 0.0 | 0.0 | 0.0 | 0.0 | 9 |
During the day some warning were received from CHIRON, it was necessary to pump the instrument to control the parameters. Some afternoon's calibrations were taken during this time, please consider to check these calibrations in case they were affected.
The program was completed successfully + extras.