Date:
Tuesday, January 26, 2021
Telescope:
CTIO 1.5-m
Submitter:
Leonardo Paredes
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
None
Problems:
- Problems of communication between the TCS and chiron controller at the end of the night. Intermittent communication eventually broke at the end of the night, causing that the headers in the fits files of Alpha Cen B observing sequence do not include TCS info. The problem was solved restarting the controller before starting the next target.
Program:
Proposal:
SMARTS/CHIRON
Target of Oportunity:
No
Time Observed:
8.75
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Leonardo Paredes
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2021-01-26 | 8.75 | 0.0 | 0.25 | 0.0 | 0.0 | 9 |
None.