Date:
Monday, January 4, 2021
Telescope:
CTIO 1.5-m
Submitter:
Roberto Aviles
Submitter Email:
Observer Support:
None
Night Assistant:
None
Problems:
- 06:30 UT fails to START exposure on T0190496853: PRESET UNDEF, NOS reSEND fails to connect to TCS. Rebooted OPTGUI, OK, now NOS reSEND connects to TCS and integration STARTed correctly.
- NOS line #37 reached OPTGUI but did not reach the TCS: sent that manually.
- Object delta Cir unreachable (dome limits); reachable at second try.
Program:
Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2021-01-04 | 8.25 | 0.0 | 0.25 | 0.0 | 0.0 | 8.5 |
Since Tololo and Pachon DIMM seeing monitors are down, tried GEMINI South but is not working either! The DIMM is doomed! Damn!
- Added G2K000950, both components, 540 [s] each (~ 26K counts), + ThAr lamp.
- Completed last integration with the Sun at -9.0 degrees of altitude.