You are here

ENR CTIO 1.5-m 2019-09-27

Primary tabs

Date: 
Friday, September 27, 2019
Telescope: 
CTIO 1.5-m
Submitter: 
Roberto Aviles
Submitter Email: 
Observer Support: 
None
Night Assistant: 
None
Problems: 

After a system restart the CHIRON did not reconnect.

Humberto restarted the machine ctioe1 and the Torrent controller, that recovered the system but,  OPTGUI's Temperature LED is in RED state; though, apparently, everything is working OK.

07:13 UT lost connection to CHIRON DB, executed line 38 ThAr lamp from CHIRON OPTGUI. Lost around 5 minutes. The error message is shown below:

Unable to connect to database, please report this to the webmaster immediately.: MDB2 Error: connect failedconnect: [Error message: Connection refused] [Native code: 2002] [Native message: Connection refused] ** mysql(mysql)://lparedes:xxx@127.0.0.1:3307/chiron
Comments: 

Skipped, no time for TOI-1072 (which needs one hour.)

Once again DIMM2 is not working on a continuous, useful, basis. So, using the Pachon seeing monitor.

 

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.30
Seeing Variability: 
0.4
Seeing Source: 
Pachon Seeing Monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
Pachon Seeing Monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
Pachon Seeing Monitor
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
Pachon Seeing Monitor
Sky: 
0
Program: 
Proposal: 
K Kids
Target of Oportunity: 
No
Time Observed: 
10.5
Time Engineering: 
0.0
Time lost technical: 
0.5
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Todd Henry
Institution: 
SMARTS
Instrument: 
CTIO 1.5m Echelle
Organization: 
SMARTS
Total Program Time: 
11
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2019-09-27 10.5 0.0 0.5 0.0 0.0 11