Date:
Friday, June 29, 2018
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hinojosa
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hinojosa
Problems:
In the beginning of the night the TCS was rebooted to fix the auto dome, it worked the first half of the night, then the problem came back.
Program:
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
10.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-06-29 | 2.0 | 0.0 | 0.0 | 10.0 | 0.0 | 12 |
TELOPS: Please check the dome again (and the TCS), it is crazy…
Strong wind along the night, the most of the time the wind speed was close or over the limit, just some few targets were observed.
No data from the DIMM tower.