Date:
Thursday, June 14, 2018
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hinojosa
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hinojosa
Problems:
At the beginning of the night, I had problems with the synchronization between the dome and the telescope. I restarted the dome azimuth in the dome init position.
Due to bad weather conditions some targets in the first half of the night were observed with poor signal.
Program:
Target of Oportunity:
No
Time Observed:
5.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
6.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-06-14 | 5.5 | 0.0 | 0.0 | 6.5 | 0.0 | 12 |
None.